§ 15.20.020. Building permit—Concept review.  


Latest version.
  • A.

    Prior to filing an application for a building permit under the provisions of Section 15.20.030 or 15.20.040, a prospective applicant may file with the Port Wardens a sketch setting forth a concept plan of the proposed improvements. The sketch shall contain, at a minimum, an outline of the developable waterway area for the property, as well as the location and dimensions of all existing and proposed piers, mooring piles, mooring buoys and shore protection structures.

    B.

    Following submission of the sketch of a concept plan as provided by subsection A of this section, the chair of the Port Wardens, or the chair's designee, shall meet with the prospective applicant, together with the Director of Public Works, the Director of Planning and Zoning and the Fire Chief, or their respective designees. At this meeting, City officials shall review the concept plans with the prospective applicant and provide objections or suggestions, as appropriate. Thereafter, an application for a building permit may be filed pursuant to the provisions of Sections 15.20.030 and 15.20.040. To the extent practicable, the application shall take into account any objections or suggestions provided at the concept review meeting.

    (Ord. O-26-03 § 1 (part): Ord. O-31-02 § 1 (part): prior code § 10-16)

(Ord. No. O-12-16 Amended, § I, 5-23-2016)